3 simple tips when curing concrete

Vineyard Wind 1, the Largest Offsho...
Vineyard Wind 1, the Largest Offshore Wind Farm Project in the USA

What causes cracking in new concrete? And how do you prevent these cracks? Following these 3 simple tips when Curing concrete correctly while it is fresh can save you a lot of trouble later. And the good news is that just covering it with a sheet of plastic can help immensely.

You have possibly seen people cover newly done concrete work with plastic while it is curing. They do this so that dirt does not blow onto the concrete during the curing period? While it is spot-on that covering the curing concrete with plastic will keep it cleaner, there is a more important reason behind this practice: It is better to take a little time now to become familiar with this subject than to make big mistakes — perhaps even irreparable mistakes — later on, when you are right in the middle of working with concrete, mortar, etc.

  1. Place a plastic sheet cover on the concrete

Search for construction leads
  • Region/Country

  • Sector

Remember, you mix water into concrete to stimulate the cement binding agent within. As the mix dries, it will harden. But the drying, or “curing” should be steady, otherwise cracking may occur. To prevent cracking, plastic is placed over the curing concrete to trap the water inside, guaranteeing gradual curing.

2. Mist the concrete

Another of the tips when curing concrete is that you can also mist the concrete occasionally with a spray bottle to prevent it from drying too rapidly.

3. Place control joints in the concrete

How much time does it take concrete to fully cure? There is a mechanical answer and a practical answer. The technical answer is 28 days. There is one more step to take to help the concrete cure. Have you ever heard of a “control joint?”

Control joints are grooves inserted into a concrete surface to “control” cracking. Fundamentally, this groove is a deliberate, controlled crack inserted to prevent the concrete’s cracking on its own, in an unrestrained manner. By placing control joints in it before it cures, any stress the concrete will be subjected to consequently will not produce haphazard cracks that will be a landscaping eyesore.

Using a trowel or jointer, cut an even control joint that will be visually pleasing. Control joints can also be cut into existing concrete surfaces using a saw with a masonry blade attached.

 

San Francisco Bay Area Rapid Transit District (BART) Extension Project Updates

According to a Federal Transit Administration (FTA) study obtained through a Public Records Act request, the launch of San Francisco Bay Area Rapid Transit...

New Annex Group housing development planned for Bloomington, Indiana

The Annex Group, a housing developer based in Indiana has announced that they will be constructing a US$23 million housing development in Bloomington, Indiana....

If you need more information on this project. Current status, project team contacts etc. Please contact us

(Note this is a premium service)

Dennis Ayemba
Dennis Ayemba
Country/ Features Editor, Kenya

LEAVE A REPLY

Please enter your comment!
Please enter your name here