Ghana requires supply of power quality measurement system

The government of the Republic of Ghana has received a loan from the African Development Bank in various currencies to finance the cost of Electricity Distribution System Reinforcement and Extension Project (EDSREP). The GEDAP Secretariat of the Ministry of Power, on behalf of the Ghana Energy Commission, intends to apply a portion of the proceeds of this loan to eligible payments under the contract for the procurement of power quality measurement system. Supply of power quality measurement system The GEDAP Secretariat of the Ministry of Power now invites sealed bids from eligible and qualified bidders for the supply of the equipment. Interested eligible bidders may obtain further information and inspect the bidding documents at address 1 below from 09h00 to 16h00 hours GMT every working day. Bidding will be conducted through the International Competitive Bidding (ICB) procedures specified in the African Development Bank’s Rules and Procedures for Procurement of Goods and Works (May 2008 edition, revised July 2012), and is open to all eligible bidders. A complete set of bidding documents in English may be purchased by interested bidders on the submission of a written application to the address 1 below and upon payment of a non-refundable fee of $50 for foreign bidders and GHC250.00 ($57) for local bidders at GEDAP Accounts Office, Room 213, 2nd Floor of the Ministry of Power Building, Ministries Area, Accra. The method of payment will be cash. Address 1 The Project Coordinator, EDRESP GEDAP Secretariat Ministry of Power (2nd Floor, Room 215) Ministries (near SSNIT Pension House) P.O. Box SD 310, Accra Submissions Bids must be delivered to Address 2 below on or before 10.00am on 21 April 2017 and must be accompanied by a security of $7,000. Address 2 Ministry of Power Conference Room (2nd Floor, Room 210) Ministry of Power Building, Ministries (near SSNIT Pension House) Accra