HomeCORPORATE NEWSEvery job site can become a recycling center

Every job site can become a recycling center

With MB Crusher’s equipment, construction sites generate their material and have it available immediately at no extra cost wherever they are.

Produce your building material, using your heavy equipment, wherever the job site is located.
This is the easiest solution for many companies now that procurement is becoming more complex, expensive and it takes longer. And it is also the practical solution when the construction sites are located in areas where heavy vehicles have a hard time reaching it, where there aren’t connecting roads or in historical centers with traffic restrictions.

Search for construction leads
  • Region/Country

  • Sector

For example, in Bulgaria, a company had to demolish an old house and had limited space. They installed an MB-L160 crusher bucket on the Case 6 backhoe loader they already had on-site, making it quick and easy to load the debris, crush it on site, and obtain quality material that they could reuse as the foundation for the new homes.
They saved time and reduced their expenses: they didn’t need to process the material further by transporting it and repurchase it from the recycling center or a quarry. The result? A material that all companies can obtain on-site at no extra cost

This applies to those who work on large or small urban redevelopment sites or those often involved in road works, bridge demolitions, or road construction, and those who also work in quarries. Materials can be reused to create internal roads, fill holes, and reduce management costs by half. With MB Crusher’s equipment, you set up an actual recycling center on-site, with the following advantages: independence from other suppliers, reduced processing times, eliminating transportation costs, ready-to-use quality material.

In Nimes, France, a company constructing 745 housing units needed to redevelop an old farm road for inter-district service and excavate and create a drainage network for rainwater. In this context, where you need to excavate and produce a large amount of inert waste, the necessary choice was MB Crusher’s equipment. They recycled all of the material: the MB-S18 screening bucket selected the fine materials, while the BF80.3 crusher bucket processed the larger rocks. The aggregates they obtained were reused immediately by laying them over the drainage network trench, avoiding all logistical and material disposal fees and material purchasing fees. Thierry Bastide, manager of Société Travaux Publics Bastide, the company in charge of the contract, said, “the advantage is that you put back the materials that you have extracted.

The advantages don’t stop at reducing transportation fees and the cost of treating or disposing of waste but extend to the material’s quality. A recent example is when the Santo Spirito bridge in Puglia, Italy, was damaged by a landslide and needed to be demolished. The company used MB’s crusher and screening bucket to crush and reduce the material they obtained down to their desired output size. They acquired material that exceeds the standards to be reused on the job site to create the road substrate that they needed to reconstruct the bridge.

Must Read

Framed Allure at Billionaires’ Row in Palm Jumeirah, Dubai, handed over

Framed Allure at Billionaires’ Row in Palm Jumeirah, has successfully been delivered by CK Architecture. This is one of the two signature villas CK...

Brightline West, Los Angeles to Vegas High-Speed Rail

After reaching an agreement with a group of significant labor unions, Brightline, the corporation behind the project, expects construction on the bullet trains to...

Construction of Mount Hermon Apartments in Florida begins

Mount Hermon Apartments, an affordable senior housing project is now underway in the Fort Lauderdale municipality of Broward county, Florida. Housing Trust Group (HTG)...

Construction of Msenge Wind Farm in South Africa to commence

Msenge Wind Farm in South Africa, the country's first utility-scale private wind farm, is ready for construction near Bedford, Eastern Cape. This is after...

Installation of 47 groundwater pumping stations in South Sudan in the pipeline

Plans are being laid for the establishment of 47 groundwater pumping stations in South Sudan. The venture was formally announced on March 3, 2023,...

US$ 131M loan secured for 23-10 42nd Road development in New York

A US$ 131M loan has been secured for the implementation of the 23-10 42nd Road development in New York. This was revealed by the...

LEAVE A REPLY

Please enter your comment!
Please enter your name here