HomeCORPORATE NEWSHow to tackle a road development project at 14500 feet above sea...

How to tackle a road development project at 14500 feet above sea level with the MB Crusher Units

When the local authority in India, announced a new road project located at 4400m above Sea Level, it did not come as a surprise that not many bidders were ready to jump in.

12 of the 38km to build were at high altitude, the closest crushing site was at 45km, but the major concern was that the area was not at all well connected. Not to mention that in the area it rains and snow for the major portion of the year and plying vehicles on wet roads was about impossible.

Search for construction leads
  • Region/Country

  • Sector

This is a tough job site, and this is when the tough get going.

Their customer had successfully met their aggregates requirement with the help of MB Crusher Bucket BF90.3 on a previous road project, they knew they had an upper edge with MB’s technology. They participated and eventually won the tender to undertake this road construction project.

MB Crusher BF90.3 is a jaw crusher bucket at all effects, but it is compact and travels attached to the carrier, so it was easy for the customer to reach the road construction site.

Due to the crusher bucket minimum access necessity, they started sourcing boulders from the surrounding area and prepared a huge pile of sub-base aggregate readily available along with the project site. They also managed to crush river rocks, thus eliminating their dependency on third party aggregate suppliers as well as saving on the expensive transportation cost.

They manage to create a crushing plant directly where needed, even at a high altitude. Eliminating so many expenses that they decided to purchase 2 more crusher buckets to use on this project. The result was outstanding with the use of the MB Crusher buckets, they met their GSB 63mm down and WMM 40mm down requirements independently and were also able to complete the project ahead of the anticipated deadline.

Looking back it was not that arduous when tackled with MB’s Crusher bucket, was it?

 

 

 

 

 

Must Read

Construction of US$ 200M solar panel manufacturing plant in Ohio in the pipeline

Plans are underway for the construction of a US$ 200M solar panel manufacturing plant in Ohio. The facility is set to be built by...

Ground breaks for electric vehicle (EV) battery giga factory in Kokomo, Indiana

A groundbreaking ceremony has been held for a new electric vehicle (EV) battery giga factory in Kokomo, Indiana. The project is developed by Stellantis in...

Brightline West, Los Angeles to Vegas High-Speed Rail

After reaching an agreement with a group of significant labor unions, Brightline, the corporation behind the project, expects construction on the bullet trains to...

Saudi Arabia: Neom City Project Updates

A multi-year PMC contract for NEOM International Airport Project has been awarded to AECOM. As per the contract, the global infrastructure consulting firm will...

Construction begins on the Kennedy Expressway, Chicago

The next week will see the start of a three-year construction project on the Kennedy Expressway. Up until July, certain sections of the two...

Construction to begin on Illinois Youth Center in Lincoln

Construction on a new Illinois Youth Center in Lincoln for youth in the custody of the Illinois Department of Juvenile Justice was announced by...

LEAVE A REPLY

Please enter your comment!
Please enter your name here