Jersey’s shining Sludge plant sets standards

Home » CORPORATE NEWS » Jersey’s shining Sludge plant sets standards

Jersey, the largest of the Channel Islands. Famed for its Royal new potatoes as well as its equally delicious dairy products from its iconic purebred cattle – and now, for those with an interest in exemplary engineering standards of management, research, design, efficiency, easy maintenance and high performance…its sewage treatment works.

Granted, the STW may never feature in any Channel Islands’ tourism brochure, but as home also to one of the world’s leading international finance centres, Jersey certainly knows a thing or two about how to invest money.

When the time came to replace the sludge plant (built in 1959) at the island’s STW to meet future environmental standards (and a population already in excess of 105,000), customer and main process engineering contractor soon found that their respective drivers to meet a 2035 design horizon had plenty in common.

Three years on, yet the plant at Bellozanne – at times carbon neutral – still shines like new – but this isn’t some strange coincidence or due to Jersey’s kind Gulf Stream climate.

From the outset, Jersey’s Department for Infrastructure, together with Doosan Enpure, knew that with the logistical challenges faced by the island, the aforementioned criteria of efficiency, ease of maintenance and high performance was crucial, particularly for the plant’s pumps and mixing systems. Fog or high winds can soon stop goods from reaching Jersey, so Bellozanne STW has to be self-sufficient – and have back-up.

“The new plant gave us the perfect opportunity to engineer out old unwanted problems”, said Bob King, Senior Engineer (Waste Strategy – Mech & Process) at the States of Jersey’s Department for Infrastructure.

“Previously, for example, we had an ongoing nightmare with very costly maintenance for compressors, which went down even if there was just a small amount of foam in our old gas mixing system. We also suffered with ragging and problems with pipework and fittings that simply weren’t of a design”.

Jersey’s Shining Sludge plant sets standards
Left to Right, Bob King and Gary Davies from Bellozanne STYW with Landia’s Paul Davies
 All pipework and moving parts should be on the outside of the tank

Weighing up Bellozanne’s drive towards a highly robust plant where downtime would be a thing of the past, Doosan Enpure were also busy sourcing kit that would meet key requirements, especially for low maintenance, as Michelle Macleod, Principal Mechanical Engineer explains:

“We certainly agreed straight away that for the three new anaerobic digesters, all pipework and moving parts should be on the outside of the tank”, she said.

“Externally-mounted equipment would also improve health and safety by eliminating the need for working at height, and confined space entry”.

Together with Gary Davies, Principal Engineer at Bellozanne STW, Bob King (25 years at the plant) carried out several field trips to research suitable mixers, seeking equipment that would also mix the whole tank – away from systems that provide little or no rotation.

“Eventually we visited Landia in Denmark to see for ourselves” continued Bob, “As well as seeing the GasMix digester mixing system, the set-up and the people was impressive the moment we walked in – which gave us confidence too in the type of service and back-up that we were going to get.  We didn’t want any breaks that would interfere with our gas production.  Lowest possible price wasn’t our objective – not for one second.  We were making decisions on what was most appropriate – for the long-term. A mixing system that could produce the most gas yet be the lowest on maintenance made perfect sense”.

Utilising its proven chopper pump to break down particle size, Landia’s GasMix also includes multiple venturi nozzles, depending upon requirements.

Doosan Enpure’s Michelle Macleod added: “Landia were very helpful because we wanted everything at ground level, meaning no access platforms at the side of the tanks – which saves time and money – putting the solenoid valves that power the pneumatic actuators down to a solenoid box at ground level in an explosion-proof enclosure.  We also wanted an isolation valve included between digesters and the actuated valve so that we wouldn’t have to decommission an entire digester if we had a problem with a valve.  Operating times also came into the decision to choose Landia, rather than systems that run flat out, so in effect, it gives the operator the flexibility and confidence to fine-tune the mixing for maximum gas yields”.

At the old Bellozanne plant, lime that caused a distinctive rotten fish odour was used to enhance the treatment of sludge – at a cost of £80,000pa but that expenditure has gone.  Now there is Doosan Enpure’s established pasteurisation technology that holds the sludge at 55 degrees C for a minimum of 4 hours, prior to passing to the anaerobic digesters.

“As well as the pasteurizers”, continued Gary Davies, “the investment in our CHP sees minimal flaring of gas. It all goes to the CHP – and we can now use the excess heat to heat the sludge.  The whole focus of our operation has changed, because we look at gas production every day and see how, if possible, we can tweak it to make it better.  We might see if we can thicken more, thicken less, change feed rates – look at what is coming in, look at what is being washed away.  We’ll never stop wanting to learn and improve”.

He added: “Doosan Enpure are very good process people to work with, helping us achieve up to 500kW of electricity (and the same again in heat) – about £800 to £1,100 per day.  The pasteurizers make a big positive difference in presenting the digesters with much better material.  Further on in the process, we now have far less grit/silt and rag to deal with.  Before we had to take a digester out of service, bring in costly tankers to remove two to three metres of grit/silt and rag – but now we’re very much heading in the right direction”.

One area that did require much more than mere fine-tuning was the continuous furring up of the new plant’s heat exchangers, which were having to be cleaned every week – going against Bellozanne’s quest for low, low maintenance.

“Initially we blamed the exchangers, as perhaps most operators do (!)” said Bob.  “We tried linking them in series, in parallel, but eventually we found the remedy by introducing an air-line.  Our heat exchangers now have no trouble reaching their required temperatures and require very little in the way of cleaning.  The downside to this was additional wear to the pasteurizer mixing pumps, caused by aerated sludge.  This issue was addressed by upgrading to hardened impellers to improve service life.

Bellozanne and Doosan Enpure also chose Landia pumps for three separate tanks containing digested sludge, thickened sludge (fed to the digesters via pasteurizers) and unthickened sludge that comes off the final clarifiers, which is then thickened and added to the thickened tank to maximise overall residence time.  As with the Landia chopper pumps on the GasMix systems of the three digesters, none has required any spare parts since being installed three years ago.

 Good mixing is critical

Dave Garnett, Technical Specialist (Wastewater) at Doosan Enpure says that Bellozanne is achieving high Volatile Solids (VS) destruction at an average of around 60%.

“The pasteurizers must help, but good mixing is critical with the high temperature feed to the digesters to make sure that everything is distributed properly.  Landia’s GasMix is working very well indeed because we’re seeing plenty of energy produced by the CHP (that has already more than paid for itself), so making a big reduction in OPEX”

He added: “It is interesting that many digesters in the industry run on 2 to 2.5% solids, when with a simple retrofit to a superior mixing system, they could increase to 4% and see an immediate pay off”.

The digesters are being mixed properly

Gary Davies agrees: “From a process point of view, the good mixing we have here with the Landia equipment is very important for consistency.  It has a very positive knock-on effect all the way through, including that big reduction in grit/silt, because we can see that the digesters are being mixed properly”.

Further evidence of the plant’s enviable performance comes in the shape of the sludge cake. Without lime, there was some concern initially about how consistent it would be, but according to Bob King, the plant now produces a far better product.

“It is much more appealing to farmers, for whom we now provide technical assistance to help them with spreading compliance, testing their fields for them.  We still have more we can achieve in this area, but we’ve already come a long way since we used to have to pay farmers to take the treated sludge away!”

Gary Davies continued: “Overall, we now have a far more complex plant – yet our investment in quality equipment is saving us money.  Not everybody understands the drivers when being on an island.  No point supposedly saving £1M on CAPEX if it’s then going to cost you an extra £3M in maintenance.  This plant’s performance proves that we are winning the argument”.

Doosan Enpure’s Michelle MacLeod agrees: “I’ve never seen such a clean, tidy and well-maintained site – which is highly beneficial for the equipment – run by people who are very knowledgeable about the process – and care about it”.