Last Updated: Dec 19, 2025
Home » Buildings » Hotels » Groundbreaking Ceremony held for US$8.9 Billion MGM Osaka

All You Need To Know About The US$10 Billion MGM Osaka Integrated Resort

Home » Buildings » Hotels » Groundbreaking Ceremony held for US$8.9 Billion MGM Osaka

The MGM Osaka Integrated Resort is a landmark US$10 billion hospitality and entertainment complex being developed in Osaka, Japan. Located on the artificial island of Yumeshima, this massive project—unfolding alongside other major developments such as IHG breaking ground on a massive triple-branded hotel complex near Universal Studios Japan—is a joint venture between MGM Resorts International and ORIX Corporation. Set to become Japan’s first legal casino, the development will feature three luxury hotels comprising 2,500 rooms, a 3,500-seat theater, and extensive convention space.

The project’s budget has surged from an initial $8.9 billion to over $10 billion, driven by soaring global construction material costs and Japan’s acute labor shortages. Additionally, complex groundworks on the reclaimed island—specifically essential soil stabilization to prevent liquefaction—have significantly added to the expense. While construction officially began in April 2025, heavy structural work is temporarily restricted to minimize disruption to the adjacent World Expo 2025, further pressuring the timeline toward its Autumn 2030 opening.

​Published 25 April 2025: On April 24, 2025, a ceremonial groundbreaking marked the beginning of construction for MGM Osaka, Japan’s first integrated resort casino, situated on the man-made island of Yumeshima in Osaka Bay. The event, attended by officials from MGM Resorts International and Orix Corporation, featured traditional sake barrel-breaking to signify a new beginning. This ¥1.27 trillion (approximately $8.9 billion) project is anticipated to be completed by 2030. It will position itself as a significant player in Asia’s gaming and tourism industry.

Also Read Japan loans US$900 million for MRT East-West system, Jakarta

Features at the MGM Osaka

MGM Osaka is envisioned as a comprehensive entertainment hub. It will feature 2,500 hotel rooms across three brands: MGM Osaka, MGM Villas, and MUSUBI Hotel. The resort will also include a 3,500-seat theater, 400,000 square feet of meeting and exhibition space, a spa and fitness center. Additionally, there will be numerous restaurants and bars, a shopping mall, and a public park. Furthermore, a dedicated facility promoting tourism throughout Japan. The casino, occupying no more than 3% of the resort’s total indoor area as per Japanese regulations. As such, it is expected to offer around 2,000 slot machines and 200 table games.

Project Overview

Location: Osaka, Japan

Project Cost: US$ 8.9 Billion

Completion year: 2030

Number of hotel rooms: 2,500

Project Architects: Nikken Sekkei, Mitsubishi Jisho Sekkei Inc., and NTT Facilities, Inc.

Developers: MGM Resorts International and Orix Corp

The $8.9 billion MGM Osaka Resort
The $8.9 billion MGM Osaka Resort

Japan’s Gambling Problem

To address concerns about gambling addiction, Japanese nationals will be required to pay a ¥3,000 (approximately $21) entrance fee to access the casino. Osaka residents paying an additional municipal fee, doubling the cost to ¥6,000 (approximately $42). These measures aim to mitigate potential negative social impacts while allowing the country to benefit from increased tourism and economic activity.

Also Read First Phase of the largest data center in Japan completed

An interesting aspect of the MGM Osaka project is its location on Yumeshima Island, which is also the site of Expo 2025. This strategic positioning is expected to enhance the island’s appeal as a tourist destination. In addition, it will leverage the global attention from the Expo to boost the resort’s profile. Additionally, plans are underway to extend the Osaka Metro Chūō Line to Yumeshima. This will improve accessibility to the island and integrating the resort more seamlessly into the city’s transportation network.

Nathan G is a reporter from Nairobi, Kenya. He has written for Construction Review for just over four years. He is currently a university student at one of Nairobi's top universities studying for a Bachelor of Science in Finance.

Leave a Comment