The global engineering-firm Bechtel has announced a strategic initiative with NVIDIA to accelerate delivery of next-generation AI data-centres. By modularising NVIDIA’s existing blueprint for 1-gigawatt class facilities, Bechtel says it will speed design and construction worldwide. The partnership reflects mounting demand for hyperscale AI infrastructure and the need for repeatable, scalable solutions in critical infrastructure delivery. Together, the companies aim to transform how AI “factories” are built, bringing industrial-project rigor to digital-infrastructure development.
Design work is already under way, with Bechtel applying its megaproject experience to take the NVIDIA blueprint into a modular, replicable format. This approach moves beyond custom one-off builds toward a factory-style delivery model that emphasises speed, repeatability and reliability. By adopting a unified engineering, procurement, construction and commissioning model, the programme seeks to shorten the time from project launch to “first token” — when the facility processes its first piece of production data. The initiative therefore targets both construction professionals and digital-infrastructure investors.
Project Factsheet
Lead organisations: Bechtel (engineering & construction) and NVIDIA (blueprint & design tools)
Focus: Modularising a 1-gigawatt-class AI data-centre blueprint for global deployment
Key ambition: Reduce build-time and speed path to “first revenue token” for customers
Delivery scope: Full infrastructure stack including power generation, water treatment, data-centre and supporting systems
Announcement date: October 28, 2025
Significance of the project
This collaboration has broad implications because it moves data-centre construction into the realm of large-scale industrial delivery with the same repeatable methods used for manufacturing plants or energy facilities. By standardising design and applying modular construction techniques, the initiative promises cost efficiencies, faster schedule performance and greater predictability for major stakeholders. Additionally, the integration of digital-twin tools and simulation workflows from NVIDIA enables Bechtel’s teams to validate designs in virtual environments before onsite work begins, reducing risk and aligning with the digital-construction trend.
Blackstone-backed AirTrunk and HUMAIN Partner to Invest US$3 Billion in Saudi Data Center Campus

The project could significantly benefit supply chains and regional economic development. A case in point is the US$3 billion Saudi data center campus by AirTrunk and HumaiN, backed by Blackstone, which illustrates how mega digital-infrastructure investments can reshape regional economies through technology-driven construction. For example, the modularisation strategy creates opportunities for prefabrication yards, local content sourcing and workforce training in modular systems assembly, all of which can stimulate job creation and regional industrial clusters. Furthermore, data-centre delivery at this scale drives specialised civil-infrastructure demand—such as power substations, chilled-water plants, and high-capacity switches—offering large construction-service packages to local firms. For countries like Kenya and across Africa, the model may offer transferable lessons in how to build digital infrastructure with industrial-scale efficiency, promoting local participation and boosting skills development in the built-environment sector.
