Project factsheet: Winchester solar-plus-storage facility
Developed by Torch Clean Energy and Fluence Energy, Inc.
Project overview
LocationCochise County, Arizona
Project developerTorch Clean Energy
Energy storage providerFluence Energy, Inc.
Energy storage solutionFluence Gridstack Pro 5000™
StatusIn development
Anticipated deliveryEarly 2027
Key features and specifications
Energy storage capacity160 MW / 640 MWh, delivered across two identical systems
Solar arraysThe project will sit alongside two existing 80 MW solar arrays
Domestic manufacturingKey components, including enclosures, inverters, and thermal management systems, will be manufactured in the U.S.
Domestic content tax creditsThe use of domestically manufactured components allows the project to qualify for federal tax credits
Project goals and benefits
Grid balancingThe facility will provide energy storage to balance the electric grid by absorbing and dispatching power as needed.
Load growthIt will help meet forecasted electricity load growth in the region.
Economic development: The project is expected to support economic development and local infrastructure investment in Cochise County.
Renewable energy integrationIt enables more effective integration of cost-effective solar generation into the grid.




Leave a Reply