Factsheet
Project NameTAZAMA Pipeline (Tanzania–Zambia Mafuta)
RouteDar es Salaam, Tanzania to Ndola, Zambia
Operator & OwnershipTAZAMA Pipelines Limited, jointly owned by the Government of Zambia (66.7%) and the Government of Tanzania (33.3%)
Existing Length1,710 kilometers (927 km in Tanzania and 783 km in Zambia)
Commissioned1968
StatusOperational (Existing line) / Project developer appointed for parallel multi-product pipeline and corridor upgrade (November 2026)
Key Project Details:
- Existing Infrastructure: Consists of 954 km of 8-inch pipe and 798 km of 12-inch pipe supported by seven pumping stations (five in Tanzania, two in Zambia). It holds an installed capacity of 1.1 million metric tons per year (roughly 22,000 barrels per day) and primarily transports diesel.
- Planned Expansion (TZMPP): A new parallel, $2 billion refined multi-petroleum products pipeline designed to carry petrol, diesel, jet fuel, and kerosene.
- Expanded Capacity: Projected to handle up to 7 million metric tons of fuel annually, nearly doubling Zambia’s forecasted 2030 demand of 3.7 million metric tons.
- Regional Offtake Points: Includes up to five strategic delivery hubs along the corridor—Morogoro, Makambako, and Songwe in Tanzania, plus Mpika and Mkushi in Zambia.
- Open Access Policy: Operates under an open-access framework introduced in 2025, allowing multiple licensed oil marketing companies to book pipeline capacity and reducing local fuel pump prices.