Cfield’s Maldron Hotel in London Shoreditch underway.

Home » News » Cfield’s Maldron Hotel in London Shoreditch underway.

Cfield‘s Maldron Hotel London Shoreditch is underway with the Irish contractor ready to construct the 10-storey hotel in Shoreditch, east London.
The €88m (£75m)-turnover company is building the 149-room for Dublin-based Dalata Hotel Group under its Maldron Hotel brand, located on Paul Street.

Planning were earlier given by Hackney Council for the construction in 2019 including a condition on drainage plan for the site being set up.
The council had also referred the project’s plans to the mayor of London for possible ruling on contradicting the city’s climate change and transport policy basis . However, concerns over these were settled between the developer and the council hence the mayor declined to intervene. Last month, the local authority signed off the sites’ drainage plan.

Cfield’s Maldron Hotel London is the eighth new hotels from the developer’s current plan, with three others being planned or under way in Manchester, Liverpool with two and Brighton and Glasgow with one each. According to the mother company Dalata Hotel Group, the development cost is of around £60m. The construction will be expected to complete by the second half of 2023.

Read also:EQUANS lands 35m Pounds green Cheshire housing scheme

Other Cfield’s projects

Apart from the Cfield’s Maldron Hotel London, WELBROOK LLP had earlier awarded Cfield a tender to design and deliver a high quality Care Home at Broadwater Road, Welwyn Garden City, Hertfordshire. The 90 beds and 13 care suites will be set within landscaped grounds and offer private external gardens and upper floor terraces for residents to enjoy. The project is in partnership with Chessmann Condy & Lofthouse Architects Canham Consulting.

CField was also awarded the contract to construct 34,000sqft next generation, high bay warehousing unit in Harbour Gate Business Park, Little Island. Unit U2 is the first of 4 planned high bay logistical, storage and distribution light industrial units inside the the park. When complete, it will provide a total ground floor area of approx. 195,000sqft. The new warehouse buildings will be constructed to NZEB standard, achieving excellent environmental performance, optimising the use of natural light for a better working environment coupled with lower energy and operating costs. The construction partners include MMOS Engineers, MMCQS LIMITED, @MBA and @Edge Architects who will successfully deliver a quality product.