The renewable energy sector of India has marked a big milestone following the inauguration of a 5.4GW Gujarat Solar Cell Facility in Chikhli, Navsari. This facility was inaugurated by Waaree Energies Ltd in presence of the Gujarat Chief Minister Bhupendrabhai Patel.
Size of the Facility
The mega facility spreads across 150 acres with a built up area of 101 acres. Furthermore, this facility stands as a testament to the commitment of Waaree to a sustainable future for India.
Also read:India’s HMPL Plans 500MW Andhra Pradesh Solar Project
Gujarat Solar Cell Facility Project Factsheet
Location:
- Chikhli, Gujarat, India.
Capacity:
- 5.4 Gigawatts (GW).
Operator:
- Waaree Energies.
Significance:
- It is a major step in boosting India’s domestic solar cell production.
- It contributes to India’s goals of increasing renewable energy capacity and reducing dependence on imports.
- It is designed to increase India’s position as a global exporter of solar technology.
Technology:
- The facility is equipped with advanced, high-efficiency solar cell technology.
- Also, it utilizes an AI-equipped control room to streamline operations and increase efficiency.
Economic impact:
- It is expected to create a significant number of direct and indirect jobs, contributing to local economic development.
National goals:
- The facility aligns with India’s “Atmanirbhar Bharat” (self-reliant India) initiative and its goal of achieving 500 GW of renewable energy capacity by 2030.
- It also aligns with India’s commitments made at COP26, regarding reducing emissions and increasing renewable energy use.
Key points to note:
- This facility is focused on the manufacturing of solar cells, a crucial component in solar panels.
- The facility is designed to help India become a major player in the global solar energy market.
Some top officials who attended the inauguration ceremony include the Gujarat Chief Minister Bhupendrabhai Patel, Minister of New and Renewable Energy Pralhad Joshi, and Navsari MP and Minister of Jal Shakti C.R Paatil. Also, in attendance were the senior Gujarat ministers.
Furthermore, the facility has been equipped with cutting edge high-efficiency solar technology. Indeed, it is a product of Waaree’s relentless focus on innovation that is research-driven and incorporated with precision engineering and sustainability.
Significance of the Project
Other than Waaree’s technological excellence, this facility clearly indicates the commitment of the company to social responsibility. This will be credited to the creation of approximately more than 9,500 jobs directly and 30,000 indirect job opportunities. Therefore, this will greatly contribute to the local economic development.
Furthermore, other than the production capabilities of the facility, it aligns with the broader decarbonisation goals of India. Also, this facility is set to ensure a cleaner, greener, and more self-reliant energy future for the nation.
Having a very strong and diverse presence in the clean energy sector of India, Waaree is involved in the strengthening of India’s position in the global renewable energy market. Lastly, this factory plays a very key role in attaining India’s ambitious target of 500GW of renewable energy by the year 2030.
Also read: $130 Million Solar Project Contract Awarded in Bangladesh, India