All Saints Cathedral Nairobi has embarked on a US$10m project that involves the construction of a Children and Teen Centre (CTC)
The project will be constructed in 3 phases over a 4 and a half year period and when completed will have an amphitheater to hold over 1000 people as well as 36 classrooms.
- See who are involved in the project by clicking here
- Leave a comment below
- Post a new project here
The project is already assigned and under construction.
Follow this lonk to see who the project team is
https://constructionreviewonline.com/wp-content/uploads/2018/11/IMG_20181122_121526_resized_20181122_125034959.jpg
Sir, how can we participate as i am interested in Mechanical Engineering
Spectacular complex CTC project at ALL SAINTS’ CATHEDRAL CHURCH, NAIROBI.
#Awesome.
Sir, I am interested in doing work in Ghana. Do you have a link to several Ghana Projects?
The project is already assigned and under construction.
Follow this lonk to see who the project team is
https://constructionreviewonline.com/wp-content/uploads/2018/11/IMG_20181122_121526_resized_20181122_125034959.jpg
Dear sir
We are Italian architecture and design company we interested to enter this project.
Please inform us if already assigned or not .
Thanks
DR. Paolo