T1 Energy Kicks Off Construction on $425M Texas Solar Cell Hub, G2_Austin

Home » Buildings » Industrial » T1 Energy Kicks Off Construction on $425M Texas Solar Cell Hub, G2_Austin
G2_Austin

G2_Austin Solar Cell Facility: Factsheet

Location: Manor (Milam County), Texas

DeveloperT1 Energy Inc.

Investment$400 – $425 Million

TechnologyTOPCon (Tunnel Oxide Passivated Contact) Solar Cells

Capacity (Phase 1)2.1 GW Annually

Capacity (Future Potential)Up to 5.3 GW Total

Construction StartDecember 2025

Target CompletionLate 2026

Job CreationUp to 1,800 manufacturing jobs

Supply Chain Integration:

Feeds T1’s 5 GW G1_Dallas Module Plant

Sourced by Hemlock Semiconductor (Polysilicon) and Corning Inc. (Wafers)

Economic Impact and Strategic Context

Situated on over 100 acres in Milam County, the project will be a major economic driver for the region—a renewable momentum further evidenced as Cypress Creek closes financing and starts construction of the 500 MW Meta-backed Hanson Solar project in Texas. T1 Energy projects the facility will support up to 1,800 new advanced manufacturing jobs once fully operational. The company’s leadership highlighted that this investment is supported by pro-growth trade policies designed to reshore critical energy infrastructure. Beyond the initial 2.1 GW phase, the site has been master-planned to accommodate a potential second phase that could add another 3.2 GW of capacity. This will be contingent on market demand. This scalability positions T1 Energy to potentially exceed 5 GW of total cell production in the future. It directly addresses the U.S. solar industry’s urgent need for secure, compliant components.

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *