Project Factsheet
Location18300 Snow Road, Brook Park, Ohio
Total Project Cost$2.6 billion
Construction TimelineGroundbreaking April 2026; Completion scheduled for 2029.
Capacity67,500 seats (scalable up to 75,000 for concerts and major events).
ArchitectHKS Architects.
Construction ManagersAECOM Hunt and Turner Construction Company (Joint Venture).
Key Architectural Features
Transparent RoofA custom-engineered, folded-plate translucent roof designed to manage Northeast Ohio’s snow while maximizing natural light.
“Super Theater” ConceptA flexible event configuration allowing the venue to scale down to 7,000 seats for intimate events or up to 75,000 for “mega-events.”
Seating ProximityDesigned to have the closest seats to the field in the NFL beating stadiums like Raymond James Stadium and Highmark Stadium, with the first row positioned just 16 feet from the action.
The Modernized “Dawg Pound”A dedicated endzone section with a 34-degree rake to create a “wall of sound,” topped by a cantilevered standing-room-only bridge.
The Grand ConcourseThe largest concourse in the NFL, uniting upper and main levels into a single cultural and culinary destination.




Leave a Reply