Project Fact Sheet
Project NameAl Ajban Solar PV Independent Power Project
LocationAl Ajban, Abu Dhabi, United Arab Emirates
Capacity: 1.5GW (AC)
TechnologyUtility-scale photovoltaic (PV) solar
Developer ConsortiumMasdar, EDF Renewables, Korea Western Power Company (KOWEPO)
OfftakerEWEC (Emirates Water and Electricity Company)
EPC ContractorPowerChina Huadong Engineering Corporation
Project StructureIndependent Power Project (IPP)
Construction Status (2026)Under construction, early works completed
Commercial Operation TargetAround Q3 2026 (projected timeline)
Key OutputPower supply for ~160,000 homes (estimated)
Carbon ImpactSignificant annual CO₂ reduction contribution aligned with UAE Net Zero 2050 goals
Strategic RoleGrid-scale renewable expansion under UAE Energy Strategy 2050
Project Team
Project DeveloperMasdar
Power Offtaker / Utility AuthorityEmirates Water and Electricity Company (EWEC)
EPC ContractorPowerChina Huadong Engineering Corporation
Co-Developers / Consortium PartnersEDF Renewables; Korea Western Power Company (KOWEPO)
Engineering ScopeSolar PV plant design, procurement, installation, and commissioning
Grid Integration AuthorityAbu Dhabi transmission and dispatch infrastructure (EWEC-controlled system)
Project TypeUtility-scale renewable energy IPP
Strategic AlignmentUAE Energy Strategy 2050 and Net Zero by 2050 initiative