DFW Skylink Bridge Spans to Be Altered for Terminal F Taxi Lanes

Home » Transport » Airports » DFW Skylink Bridge Spans to Be Altered for Terminal F Taxi Lanes
DFW Skylink Bridge Spans to Be Altered for Terminal F Taxi Lanes

Skylink guideway modifications, Terminal F Expansion Project:factsheet

  • Project: Skylink guideway modifications, Terminal F Expansion Project
  • Location: Dallas Fort Worth International Airport, Texas
  • Owner: Dallas Fort Worth International Airport
  • Design lead: Jacobs
  • Construction partner: Innovation Next+ joint venture
  • Scope: Alterations to existing Skylink guideway bridge spans; dual parallel taxi lanes beneath the light rail
  • Capacity enabled: Up to 16 new gates at Terminal F
  • Constraint: Full Skylink operability maintained through all construction phases
  • Terminal F program: $4 billion, 31 gates planned, first phase of 15 gates expected in 2027

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *