Skylink guideway modifications, Terminal F Expansion Project:factsheet
- Project: Skylink guideway modifications, Terminal F Expansion Project
- Location: Dallas Fort Worth International Airport, Texas
- Owner: Dallas Fort Worth International Airport
- Design lead: Jacobs
- Construction partner: Innovation Next+ joint venture
- Scope: Alterations to existing Skylink guideway bridge spans; dual parallel taxi lanes beneath the light rail
- Capacity enabled: Up to 16 new gates at Terminal F
- Constraint: Full Skylink operability maintained through all construction phases
- Terminal F program: $4 billion, 31 gates planned, first phase of 15 gates expected in 2027




Leave a Reply