Highland Materials’ Tennessee Polysilicon Project Prepares for Q4 2026 Groundbreaking

Home » Energy » Solar » Highland Materials’ Tennessee Polysilicon Project Prepares for Q4 2026 Groundbreaking

Factsheet: Highland Materials Polysilicon Plant – Phipps Bend, TN

  • Location: Phipps Bend, Tennessee, USA
  • Land Area: 140 acres (former nuclear plant site)
  • Initial Capacity: 16,000 metric tons/year
  • Full Capacity: 20,000 metric tons/year (by year 4)
  • Solar Cell Output Equivalent: ~11 GW annually
  • Technology: Aluminum-silicon alloy smelting system
  • Energy Consumption: 20–40 kWh per kg of silicon produced
  • Federal Support: $255.6M (48C tax credit)
  • Strategic Benefit: Reduces reliance on imported polysilicon, boosts U.S. solar supply chain

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *