Project Fact Sheet
NameNEOM Oxagon infrastructure construction package
LocationOxagon, Tabuk Province, northwestern Saudi Arabia
DeveloperNEOM
OwnerNEOM
Wider development valueApproximately $49.3 billion
Infrastructure package valueNot publicly disclosed
Procurement statusBest and final offers submitted
Project categoryIndustrial infrastructure and civil engineering
Wet infrastructurePotable water, firewater, irrigation, domestic wastewater, industrial wastewater and stormwater networks
Electrical infrastructureOptional 33kV medium-voltage networks and 230/400V low-voltage networks
TelecommunicationsUnderground ICT pathways, fibre-optic networks and communications systems
Security infrastructureSecurity systems, networks and Interior Ministry fibre connections
Civil worksRoads, pavements, signage, road furniture and landscaping
EarthworksLocal trimming, trenching, backfilling, compaction and preparation to construction levels
Highway 55 interfaceAgreed under-highway crossings and approved connections only
Construction contractorAwaiting appointment
Construction commencementNot announced
Completion dateNot announced
Project Team
Developer and project ownerNEOM, responsible for developing Oxagon as an advanced industrial and logistics city.
Utility and energy interfaceEnowa, NEOM’s energy and water subsidiary, associated with the project’s power and wet-services infrastructure.
Main infrastructure contractorNot yet announced. Contractors have submitted their best and final offers.
Electrical infrastructure contractorsTo be appointed following the procurement process.
Telecommunications and security contractorsTo be confirmed through the contract award.
Civil engineering contractorAwaiting appointment.
Highway 55 construction contractorNot identified in the available reporting.
Freight railway design consultantUnder procurement following the October 31 bid submissions.