$1bn Grand Sierra Resort Makes Headway on Decade-long Redevelopment in Reno, Nevada

Home » Buildings » Hotels » $1bn Grand Sierra Resort Makes Headway on Decade-long Redevelopment in Reno, Nevada
GSR Arena to Break Ground in Reno This September, Opening 2027

Project Overview of the Grand Sierra Resort

LocationReno, Nevada, at the Grand Sierra Resort site.

Total Estimated Cost$1 billion.

Permit Filing DateJune 30.

Initial Phase Cost$189 million.

Design TeamGensler (Architect and design lead), Meruelo Group

Overall Phase One Estimate$786 million.

GSR Arena Cost$435 million

GSR Arena Capacity10,000-seat indoor arena.

AmenitiesCommunity ice rink, food and beverage booths, 2,400-space parking garage, aqua golf driving range.

Financing ModelTax-increment financing (TIF).

TIF ApprovalPassed by the Reno Redevelopment Agency in May, with a 5-2 vote.

Tax Reimbursement90% of property taxes refunded to GSR through 2035; 10% retained by the agency.

Estimated Reimbursements$61.3 million to GSR; $6.8 million retained by the agency.

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *