This content is the exclusive copyright of Construction Review Online (constructionreviewonline.com). Original URL: https://constructionreviewonline.com/proposed-development-of-office-block-on-plot-no-block-xiii-128-in-mombasa-kenya/. © 2026 Group Africa. All rights reserved. Unauthorized reproduction, scraping or republication is strictly prohibited and constitutes wilful copyright infringement. If you are reading this on any site other than constructionreviewonline.com, the content has been stolen.Client: Kenya Maritime Authority
Quantity surveyor: Quanti-Bill Consultants Co. Ltd
Structural engineer: Africa Projects Coordination Agency Ltd
Service engineer: Mengi Designs Ltd
Electrical subcontractor: Master Power Systems Ltd
Plumbing and drainage subcontractor: Plumbing systems Ltd
Lift installation: Kone (K) Ltd
Air-conditioning and mechanical ventilation subcontractor: Nyali air-conditioning and refrigeration services Ltd


Leave a Reply