Project Fact Sheet
ProjectShaheen Petrochemical Complex
LocationOnsan National Industrial Complex, Ulsan, South Korea
Project typeIntegrated petrochemical production complex
Owner and developerS-Oil Corporation
Major shareholderSaudi Aramco
InvestmentKRW 9.258 trillion (approximately US$6.9 billion)
Site areaApproximately 880,000 square metres
Steam cracker capacity1.8 million tonnes of ethylene annually
Total additional petrochemical capacityApproximately 3.2 million tonnes annually
Technology UsedThermal Crude-to-Chemicals (TC2C)
Major facilitiesTC2C unit, steam cracker and polymer production plants
Main productsEthylene, propylene, butadiene and polyethylene
Construction startMarch 2023
Construction completionNovember 2026
Commercial operationsPlanned for 2027
Project purposeExpand petrochemical production, diversify S-Oil’s business and strengthen South Korea’s domestic feedstock supply
Project Team
S-Oil Corporation:Project owner, developer and operator.
Saudi AramcoS-Oil’s largest shareholder and strategic investment partner; co-developer of the TC2C technology.
Hyundai Engineering & ConstructionLead construction consortium member.
Hyundai Engineering:Main construction consortium participant.
Lotte Engineering & ConstructionConstruction consortium participant.
DL E&C:Contractor for the TC2C and interconnection construction package.
Lummus Technology:Co-developer of the TC2C technology with Saudi Aramco.
SABICExport marketing partner for polyethylene products.