Vouglans-Saut-Mortier pumped storage expansion and modernization project in France: Fact sheet
LocationSaut-Mortier, near Cernon, Jura
RegionJura, Bourgogne-Franche-Comte
River BasinAin River
Project StatusUnder development. ANDRITZ awarded new turbine supply contract.
Project Owner/DeveloperElectricite de France (EDF)
Engineering, Procurement and Electromechanical ContractorANDRITZ Hydro
Project ObjectiveConvert the existing Saut-Mortier hydropower station into a flexible pumped storage facility. This is through installing a new variable-speed reversible pump-turbine to increase renewable energy storage capacity and improve grid flexibility.
Reservoirs Involved:
- Vouglans Reservoir
- Saut-Mortier Reservoir
- Coiselet Reservoir
Existing Saut-Mortier Installed Capacity44 MW
New Pumped Storage Unit18 MW variable-speed reversible Francis pump-turbine
Installed Capacity After Expansion84 MW (EDF) to 87 MW (procurement documents)
Technology:
- Variable-speed Francis pump-turbine
- Generator-motor
- Voltage Source Inverter (VSI)
- Medium-voltage electrical systems
- Mechanical auxiliary equipment
- Digital automation and control systems
Scope of ANDRITZ Contract:
- Engineering and detailed design
- Manufacturing of electromechanical equipment
- Supply of the complete generating package
- Installation
- Testing and commissioning
- Automation and plant control systems
Estimated New Turbine Contract Value€32 million
Construction Period2026 to 2032
Key InnovationVouglans-Saut-Mortier pumped storage expansion project will create France’s first three-reservoir pumped storage (STEP) system. This will allow water to be recycled through Coiselet, Saut-Mortier and Vouglans for significantly greater operational flexibility.
Expected Benefits:
- Increased renewable electricity storage
- Improved integration of wind and solar power
- Faster grid balancing and frequency regulation
- Higher utilization of existing hydro infrastructure
- Better management of water flows in the Ain River
- Enhanced environmental management for aquatic ecosystems
Employment Impact:
- 837 full-time equivalent (FTE) jobs supported over the project
- Peak workforce of around 100 workers on site
Supporting Organizations:
- Agence de l’Eau (French Water Agency)
- Regional and local authorities in the Ain Valley




Leave a Reply