Project Fact Sheet
Project nameAwash–Kombolcha–Hara Gebeya Railway Construction
Value$1.7 billion
Length392 kilometers
TypeElectrified heavy rail transport construction project
RouteAwash – Kombolcha – Hara Gebeya, Ethiopia
ObjectiveRestore northern rail connectivity and link to Addis Ababa–Djibouti corridor
Speed designUp to 120 km/h
StatusRelaunched after multi-year suspension due to conflict and disputes
Original launch2015
Expected completionApproximately two years from restart (government estimate)
Key infrastructureBridges, tunnels, substations, control stations, maintenance workshops
FinancingTurk Exim Bank-supported EPC structure
ConsultancySYSTRA MD
Project Team
Project OwnerEthiopian Railways Corporation
Policy oversight and coordinationMinistry of Transport and Logistics, Ethiopia
Financial SupervisionMinistry of Finance, Ethiopia
ContractorYapı Merkezi
FinancierTurk Exim Bank
Engineering ConsultantSYSTRA MD
Electrification supportEthiopian Electric Power