500MW Mediterranean Green Hydrogen Hub Construction in Alexandria Moves into Feasibility Stage

Home » Energy » 500MW Mediterranean Green Hydrogen Hub Construction in Alexandria Moves into Feasibility Stage
Mediterranean Green Hydrogen Hub

Project Fact Sheet

Project nameMediterranean Green Hydrogen Hub Construction – Alexandria, Egypt

TypeRenewable energy-powered green hydrogen and ammonia facility

PhaseFeasibility study (MoU signed)

Renewable capacity500 MW (solar + wind)

Planned hydrogen output~480 tons/day of green ammonia equivalent

Key outputsHydrogen production, ammonia integration, renewable energy generation

Strategic targetsDevelop low-carbon ammonia, support domestic industry, and prepare for export markets

Project Team

Government oversightEgyptian Ministry of Petroleum and Mineral Resources (MoPMR) – Regulatory and incentive framework

Lead developers:

  • Green Hydrogen Development Holding Limited (UEG subsidiary) – Feasibility and technical studies
  • Orascom Construction SAE – Engineering and infrastructure feasibility lead

Industrial partners:

  • Abu Qir Fertilizers and Chemicals Company – Hydrogen integration into ammonia facilities
  • Alexandria Fertilizers Company (Alexfert) – Operational implementation and local resource support

Advisory stakeholdersTechnical, commercial, and regulatory advisors; renewable energy and grid integration specialists

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *