Project factsheet
Project: DB Fahrzeuginstandhaltung ICE maintenance depot expansion
Location: Cottbus
Owner: Deutsche Bahn
Operator: DB Fahrzeuginstandhaltung
Project value: Approximately €1bn
Project type: Rail maintenance depot expansion
Main purpose: Maintenance and overhaul of ICE 4 high-speed trains
Key facilities: Two maintenance halls, paint facility, maintenance tracks, hybrid conversion capability
Current status: First hall operational; second hall under construction
Start of operations: January 2024 (first hall)
Expected completion: End of 2026
Notable equipment: Liebherr MK 140-5.1E mobile construction crane
Key technologies: AI-assisted maintenance, robotics inspection systems, photovoltaic integration
Employment impact: Around 1,200 jobs and apprenticeships expected by 2026
Project team
Project owner: Deutsche Bahn
Depot operator: DB Fahrzeuginstandhaltung
Engineering and planning support: DB Engineering & Consulting
Project and construction consultancy: Drees & Sommer
Crane supplier: Liebherr
Crane operator: Krandienst Kunze
Liebherr cranes support roof installation works
As part of the ongoing construction works, several cranes have been deployed across the large-scale site, including the Liebherr MK 140-5.1E mobile construction crane operated by Krandienst Kunze.
The crane has been heavily involved in roof installation works on the expansive maintenance halls, lifting air-conditioning systems, insulation materials and photovoltaic modules into position across the extensive roof surfaces.
According to Liebherr, the MK 140-5.1E has been operating on the project for more than two years, supporting works requiring long outreach distances. Its compact footprint and mobility have also proved advantageous on the constrained multi-contractor construction site.




Leave a Reply