ESR has started construction on Higashi Ogishima Distribution Centre B, a JPY120 billion (about $762 million) logistics building in Kawasaki, Greater Tokyo, more than a year after the second phase was first slated to begin. The nine-story facility will add about 310,000 square meters of warehouse space and is scheduled for completion in the second quarter of 2029.
The groundbreaking, announced by ESR on November 20, brings the second building of the company’s Higashi Ogishima hub into construction. Together with the completed Distribution Centre A, the waterfront campus about 10 km from Haneda Airport is set to offer roughly 660,000 square meters of logistics space, close to the floor area of 90 soccer fields.
A Bigger, Later Second Phase
When ESR raised capital for the phase in October 2023, it described a building of about 306,000 square meters over eight stories, with works due to start in 2025. The version now under way has grown to nine stories and roughly 310,000 square meters, and it carries a new name, HOB, in place of the earlier HO DC 2 label.
ESR has not explained the later start. The company instead pointed to market timing, saying new supply of large multi-tenant logistics space in Greater Tokyo is expected to dwindle through 2027 while rents climb and vacancies fall. It is positioning the building to lease into that tighter market.
The first building offers a benchmark. Distribution Centre A, completed in 2023 with about 350,000 square meters, was billed by ESR as Japan’s first nine-story logistics facility and is now more than 87% occupied. It also holds a CASBEE S rating, the top grade under Japan’s green building system, and a five-star BELS energy rating.
Who Is Paying for It?
ESR brought together 23 Japanese investors and a long-standing European capital partner to fund HOB. The company presented the raise as evidence that institutional appetite for high-quality logistics space in Greater Tokyo remains strong.
The European partner was not named. Earlier funding for the phase flowed through ESR Japan Logistics Fund III, a development venture the company set up in 2019 with Dutch pension manager APG and an Asia-based sovereign wealth fund.
Stuart Gibson, co-founder and co-CEO of ESR, said the aim is to build the finest logistics property in Japan, one that serves tenants well while delivering strong, accretive returns to investors.
What Will the Building Offer?
Industrial designer Marc Newson, whose work spans furniture, aircraft interiors and consumer products, is designing the facade. Gibson described the project as people-first, with retail outlets, rest areas, green and shared spaces, and other amenities aimed at the workers who will staff the warehouses.
Operationally, a double-ramp layout will let trucks drive directly to upper floors. Seismic base isolation and emergency power systems are included for resilience, a priority for a Tokyo Bay site in one of the most earthquake-prone regions in the world.
Domestic lenders have backed large Japanese assets in a similar pooled fashion before, with the 100 MW Kanoya Osaki Solar Hills project in Kagoshima Prefecture financed through a syndicated loan from 17 regional banks and generating power since March 2020.





Leave a Reply