Project Factsheet
- Project Name: LEGO Manufacturing Portugal
- Owner and Developer: The LEGO Group
- Location: Estarreja, Aveiro district, Portugal
- Project Type: Manufacturing plant with molding, processing, packing and a high-bay warehouse
- Project Value: Approximately €1 billion ($1.1 billion), spent over several years
- Floor Area: 115,000 square meters
- Site Area: 60 hectares (LEGO figure); the mayor cites 116 hectares required, of which the municipality holds 45
- Status: Announced November 23, 2026; land assembly and licensing ahead
- Construction Start: First half of 2027
- Target Completion: Production expected to start in 2030
- Permanent Jobs: More than 1,000 once fully operational
- Power Strategy: 100% renewable energy target, about 80% from on-site solar and battery storage
- Water Strategy: Rainwater harvesting, treatment and reuse
- Certification: LEED Platinum target
- Contractor: Not publicly disclosed
Project Team
- Owner and Developer: The LEGO Group
- Host Municipality: Municipality of Estarreja
- Investment Agency: AICEP Portugal Global
- Legal Adviser to the Municipality: Dower Law Firm
- Design and Construction: Not yet disclosed