O’Leary Digital Launches Joint Venture to Develop 7.5-Gigawatt Data Campus in Utah

Home » Buildings » Data Center » O’Leary Digital Launches Joint Venture to Develop 7.5-Gigawatt Data Campus in Utah
O’Leary Digital Launches Joint Venture to Develop 7.5-Gigawatt Data Campus in Utah

Project Factsheet: Wonder Valley Utah Campus

Golden Spike District, Box Elder County, Utah

7.5 GWPlanned Power Generation Capacity

13,000Acres — Utah Site

1  Joint Venture Partner — West GenCo LLC

Overview

O’Leary Digital Limited is developing the Wonder Valley Utah Campus, a large-scale powered compute campus in the Golden Spike District of Box Elder County, Utah. The company is advancing the project through a strategic joint venture with West GenCo LLC, which oversees permitting and state-level regulatory coordination.

The campus will generate 7.5 gigawatts of power through phased deployment of powered buildings and integrated on-site energy and utility infrastructure. It will serve enterprise and mission-critical applications and accommodate either dedicated single-tenant campuses or segmented multi-tenant configurations.

Strategic positioning 

Direct access to major interstate natural gas infrastructure

Proximity to aerospace, defense, and advanced manufacturing ecosystems

Designed for secure, high-performance and mission-critical computing environments

Repeatable hyperscale-standard campus designs with flexible power density and cooling configurations

Scalable infrastructure buildout based on tenant demand over time

Project details 

LocationGolden Spike District, Box Elder County, Utah

Power Capacity7.5 GW — phased deployment, scalable over time

Joint Venture PartnerWest GenCo LLC (permitting & state regulatory coordination)

Deployment ModelPhased powered buildings with integrated on-site energy and utility infrastructure

Tenant ConfigurationSingle-tenant campuses or segmented multi-tenant configurations

Design StandardHyperscale-aligned; flexible power density, cooling, and infrastructure

StatusPermitting underway; capitalized toward shovel-ready execution

Capital AdvisorsBlue-chip global investment banks retained for project-level equity and debt financing

Project Team

Architecture & Master PlanningGensler

Financial & Tax AdvisoryKPMG

Electrical InfrastructureInPwr Inc.

Campus & Data Center SecurityCenCore Group

Data Center Design & EngineeringKent Data Centers (formerly Sudlows)

Construction Manager / GCClayco

Alberta Project

O’Leary Digital is separately developing Wonder Valley Alberta, located in the Greenview Industrial Gateway, Grande Prairie, Alberta. Planned for 7.5 GW of power generation capacity, the Alberta project leverages Western Canada’s energy resources and infrastructure base. Permitting is currently underway, Indigenous community engagement has commenced, and PCL Construction has been named as Construction Manager.

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *