Project Factsheet: Wonder Valley Utah Campus
Golden Spike District, Box Elder County, Utah
7.5 GWPlanned Power Generation Capacity
13,000Acres — Utah Site
1 Joint Venture Partner — West GenCo LLC
Overview
O’Leary Digital Limited is developing the Wonder Valley Utah Campus, a large-scale powered compute campus in the Golden Spike District of Box Elder County, Utah. The company is advancing the project through a strategic joint venture with West GenCo LLC, which oversees permitting and state-level regulatory coordination.
The campus will generate 7.5 gigawatts of power through phased deployment of powered buildings and integrated on-site energy and utility infrastructure. It will serve enterprise and mission-critical applications and accommodate either dedicated single-tenant campuses or segmented multi-tenant configurations.
Strategic positioning
Direct access to major interstate natural gas infrastructure
Proximity to aerospace, defense, and advanced manufacturing ecosystems
Designed for secure, high-performance and mission-critical computing environments
Repeatable hyperscale-standard campus designs with flexible power density and cooling configurations
Scalable infrastructure buildout based on tenant demand over time
Project details
LocationGolden Spike District, Box Elder County, Utah
Power Capacity7.5 GW — phased deployment, scalable over time
Joint Venture PartnerWest GenCo LLC (permitting & state regulatory coordination)
Deployment ModelPhased powered buildings with integrated on-site energy and utility infrastructure
Tenant ConfigurationSingle-tenant campuses or segmented multi-tenant configurations
Design StandardHyperscale-aligned; flexible power density, cooling, and infrastructure
StatusPermitting underway; capitalized toward shovel-ready execution
Capital AdvisorsBlue-chip global investment banks retained for project-level equity and debt financing
Project Team
Architecture & Master PlanningGensler
Financial & Tax AdvisoryKPMG
Electrical InfrastructureInPwr Inc.
Campus & Data Center SecurityCenCore Group
Data Center Design & EngineeringKent Data Centers (formerly Sudlows)
Construction Manager / GCClayco
Alberta Project
O’Leary Digital is separately developing Wonder Valley Alberta, located in the Greenview Industrial Gateway, Grande Prairie, Alberta. Planned for 7.5 GW of power generation capacity, the Alberta project leverages Western Canada’s energy resources and infrastructure base. Permitting is currently underway, Indigenous community engagement has commenced, and PCL Construction has been named as Construction Manager.