Revolution Wind Project Factsheet
Project Overview
- Name: Revolution Wind
- Type: Offshore wind farm (first multi-state project in the U.S.)
- Capacity: 704 MW
- 400 MW to Rhode Island
- 304 MW to Connecticut
- Powering over 350,000 homes
- Emissions Offset: Avoids over 1 million metric tons of CO₂ annually—equivalent to removing about 150,000 cars from the road
Location
- Federal Waters: Approximately 15 miles south of the Rhode Island coast. 32 miles southeast of Connecticut. 12 miles southwest of Martha’s Vineyard
- Lease Area: BOEM’s OCS-A 0486; separated from a larger lease area in 2020
Development Partners
- Developers: Ørsted and Global Infrastructure Partners (Skyborn Renewables)
- History: Initially partnered with Eversource, which exited ownership in 2024
Technology & Infrastructure
- Turbines: 65 Siemens Gamesa 11 MW (11.0-200 DD)
- Transmission: Subsea cables to Quonset Business Park (Rhode Island), then underground to the Davisville substation and into the regional grid
Timeline & Permitting
- Environmental Review: Draft EIS released in August 2022. Final EIS and Joint Record of Decision signed in August 2023 by BOEM, NMFS, and USACE
- Construction: Began in 2023
- First Turbine Installed: September 2024
- Target Commercial Operation Date (COD): 2026