Project Factsheet
RouteTabora to Kigoma (Tabora Urban, Uyui, Urambo, Kaliua, Kigoma Rural, Kigoma Urban)
Total Track Length506 km (411 km mainline + 95 km passing loops and sidings)
Track Gauge1,435 mm (Standard Gauge)
Electrification25 kV AC 50 Hz overhead catenary
Design SpeedsUp to 160 km/h for passenger trains; up to 120 km/h for freight trains
Implementing AgencyTanzania Railways Corporation (TRC)
Financial Overview
- Commercial Financing Facility: $1.2 billion secured through a nine-bank commercial syndicate co-arranged by Deutsche Bank and Société Générale
- Anchor Guarantor: African Development Bank (AfDB) providing $800 million under a Partial Credit Guarantee (PCG)
- Structure: $720 million in guaranteed lending combined with $480 million in sovereign clean risk exposure
- Overall Funding Scope: Forms part of a broader $2.3 billion financing framework for the corridor
Economic and Strategic Value
- Regional Trade: Connects agricultural and mining hubs along Tanzania’s Central Corridor to the Port of Dar es Salaam and Lake Tanganyika.
- Cross-Border Integration: Serves as a vital transport link extending trade access to Burundi and the Democratic Republic of Congo.




Leave a Reply