Tanzania SGR Lot 6 Project: Country Secures $1.2B Commercial Financing for Tabora-Kigoma Line

Home » Transport » Rail » Tanzania SGR Lot 6 Project: Country Secures $1.2B Commercial Financing for Tabora-Kigoma Line

Project Factsheet

RouteTabora to Kigoma (Tabora Urban, Uyui, Urambo, Kaliua, Kigoma Rural, Kigoma Urban)

Total Track Length506 km (411 km mainline + 95 km passing loops and sidings)

Track Gauge1,435 mm (Standard Gauge)

Electrification25 kV AC 50 Hz overhead catenary

Design SpeedsUp to 160 km/h for passenger trains; up to 120 km/h for freight trains  

Implementing AgencyTanzania Railways Corporation (TRC)

Financial Overview

  • Commercial Financing Facility: $1.2 billion secured through a nine-bank commercial syndicate co-arranged by Deutsche Bank and Société Générale
  • Anchor Guarantor: African Development Bank (AfDB) providing $800 million under a Partial Credit Guarantee (PCG)
  • Structure: $720 million in guaranteed lending combined with $480 million in sovereign clean risk exposure
  • Overall Funding Scope: Forms part of a broader $2.3 billion financing framework for the corridor

Economic and Strategic Value

  • Regional Trade: Connects agricultural and mining hubs along Tanzania’s Central Corridor to the Port of Dar es Salaam and Lake Tanganyika.
  • Cross-Border Integration: Serves as a vital transport link extending trade access to Burundi and the Democratic Republic of Congo.

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *