Standard Chartered Plc has arranged a $2.2 billion loan with export credit agencies for Tanzania SGR project by Yapi Merkezi. This is according to Turkish contractor Yapi Merkezi Insaat VE Sanayi AS. The deal will be signed April 28 in the East African nation’s capital, Dodoma, and will finance the third and fourth legs of the 1,219-kilometer (757-mile) track, Yapi Merkezi Vice Chairman Erdem Arıoğlu told Bloomberg in an interview.
The two phases run through Makutupora, Tabora and Isaka. The funding comes after Tanzania also held talks with Standard Chartered for a loan in Washington D.C. The meeting, hosted at the Tanzanian Embassy on the sidelines of the 2026 IMF/World Bank Spring Meetings. It was led by Zanzibar Minister of State for Finance and Planning Dr. Juma Malik Akil on behalf of Finance Minister Khamis Mussa Omar.
Outlook on the Tanzania SGR Project by Yapi Merkezi
The successfulness of the current loan places Standard Chartered as lead financier on the Tanzania SGR project by Yapi Merkezi. Reports in 2024 that the first completed 541-km section between Dar es Salaam and Dodoma cost $3.1bn.
Moreover, the government said a $1.46bn loan from Standard Chartered helped fund part of that stretch. The $2.2bn loan will be fundamental in facilitating the remaining stretch of rail to be completed. Tanzania Railways Corporation says the planned Standard Gauge Railway network will span about 2,561 kilometres. It links the port of Dar es Salaam with inland commercial centres and neighbouring countries. Other East African nations such as Kenya are also working on their SGR as it seeks to electrify its rail to connect with Uganda.
These include including Rwanda, Burundi and also the Democratic Republic of Congo. The Turkish firm has been fundamental in the delivery of the nation’s SGR in many aspects. These include the construction of multiple phases (Lots 1–4) covering over 1,000 km.
Lot 1 & 2: Dar es Salaam to Makutupora.
Lot 3 & 4: Makutupora to Tabora and Tabora to Isaka.
In addition to the railway track, the scope includes 3 stations, maintenance workshops, a depot area, a Railway Institute, electrification, signaling, and telecommunication systems.

Other Projects
In other developments, Tanzania and Angola have agreed to pursue a major cross-border railway connection that would link the Atlantic and Indian Ocean coasts through Angola, the Democratic Republic of Congo (DRC), Zambia and Tanzania. The proposed infrastructure link is expected to strengthen regional trade and improve freight transportation. It is also expected to create an alternative logistics route for landlocked countries in Central and Southern Africa.





Leave a Reply