Tanzania SGR Project by Yapi Merkezi Secures $2.2bn Loan from Standard Chartered

Home » Transport » Rail » Tanzania SGR Project by Yapi Merkezi Secures $2.2bn Loan from Standard Chartered
Tanzania SGR Project by Yapi Merkezi

Project Factsheet:

Project NameTanzania Standard Gauge Railway (SGR) Project

LocationTanzania

Estimated Investment Value$2.2 Billion loan package (latest financing)

Project TypeNational railway infrastructure

Timeline

2024First 541 km Dar es Salaam–Dodoma section reported completed

April 28, 2026$2.2 billion loan signing scheduled in Dodoma

2026 onwardFinancing to support Lots 3 and 4 construction

Site & Scale

Current Main Corridor1,219 km

Planned Full Network~2,561 km

Latest Financed SectionsMakutupora – Tabora – Isaka

Regional LinksRwanda, Burundi, DR Congo connections via inland corridors

Project Teams

ContractorYapi Merkezi

Lead FinancierStandard Chartered

OwnerTanzania Railways Corporation

Supporting LendersExport credit agencies and development finance institutions

Infrastructure Scope
Standard gauge electrified railway corridor
Passenger and freight rail operations
Also stations, maintenance workshops, depot facilities
Railway training institute
Signaling, telecom, and also electrification systems

Strategic Objectives
Modernize Tanzania’s rail network
Also improve cargo movement from Dar es Salaam Port inland
Strengthen regional trade links with neighboring countries
Reduce logistics costs and travel times

Challenges
Large capital requirements across multiple phases
Also cross-border coordination for regional integration
Execution of long-distance rail construction

Current Status
$2.2 billion financing secured for Lots 3 and 4
Also loan signing set for Dodoma
Construction expansion advancing under Yapi Merkezi

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *