Project fact sheet
Project nameGroßweil Shaft Hydropower Plant
LocationGroßweil, Bavaria, Germany
RiverLoisach River
Project typeRun-of-river shaft hydropower plant
TechnologyHydroshaft underground turbine system
Status (2026)Operational demonstration and research facility
Commercial operationOngoing
Primary objectiveGenerate renewable electricity with minimal environmental impact
Key innovationUnderground powerhouse installed beneath the riverbed
Engineering features:
- Vertical shaft construction
- Underground turbine chamber
- Reduced surface infrastructure
- Lower visual impact
- Smaller construction footprint
Research areas:
- Fish migration
- Turbine performance
- River hydraulics
- Sediment transport
- Ecological monitoring
Strategic importanceDemonstrates next-generation low-impact hydropower technology suitable for environmentally sensitive waterways.
Project team
Project developerTechnical University of Munich (TUM)
Technology developerHydroshaft technology research team
Technology commercializationHydroshaft GmbH
Research leadChair of Hydraulic and Water Resources Engineering, TUM
Project location partnerMunicipality of Großweil
Environmental monitoringTechnical University of Munich researchers
Regulatory stakeholdersBavarian water and environmental authorities
Industry partnersGerman hydropower engineering specialists and renewable energy contractors
Project purposeDemonstration, research and commercial validation of Hydroshaft technology
Current focus (2026)Long-term operational monitoring, environmental optimization and preparation for wider deployment of shaft hydropower systems in Europe.