Triso-X Finishes Main Structure on First U.S. Advanced Nuclear Fuel Plant in Oak Ridge

Home » Buildings » Industrial » Triso-X Finishes Main Structure on First U.S. Advanced Nuclear Fuel Plant in Oak Ridge
Triso-X TX-1 Oak Ridge finishes main structure, advancing the first U.S. advanced nuclear fuel plant in 50+ years toward 2028 operations.

Factsheet: TX‑1 TRISO Fuel Fabrication Facility

LocationTRISO-X Campus, Horizon Center, Oak Ridge, Tennessee

Facility size214,812 square feet (≈214,000 sq ft)

Campus size~180 acres (after recent 70-acre expansion)

OwnerTRISO-X, LLC (wholly owned subsidiary of X‑Energy Inc., Nasdaq: XE)

General contractorClark Construction Group

Key dates:

  • Vertical construction start: November 17, 2025
  • Vertical construction completion: September 24, 2026
  • Expected fuel fabrication start: Early 2028
  • NRC license expiry: February 13, 2066

Licensing:

  • First-ever NRC Category II fuel fabrication license
  • First new U.S. commercial fuel fabrication license in ~50 years
  • 40-year Special Nuclear Material License (SNM‑7007)

Production capacity:

  • TX‑1 (one line): 5 metric tons of uranium (MTU)/year ≈ 700,000 TRISO pebbles annually
  • TX‑2 (in design, two lines): 20 MTU/year
  • Combined potential: 25 MTU/year (24/7 operations)
  • Fuel sufficiency: Up to 11 Xe‑100 reactors (TX‑1 alone)

Feedstock sources:

  • LEU U3O8: Urenco USA, Eunice, New Mexico
  • HALEU U3O8: American Centrifuge Plant, Piketon, Ohio
  • Dilute uranyl nitrate: DOE Savannah River Site, Aiken, South Carolina

Jobs and investment:

  • Construction cost: $768 million over 5 years
  • Peak construction workforce: ~332 workers
  • Permanent operations jobs: ~500 full-time staff

Logistics (annual, once operational):

  • Uranium feed deliveries: ~36 truck shipments
  • Fabricated fuel shipments: ~196 truck shipments
  • Solid radioactive waste: ~60 truck shipments (mainly to Clive, Utah)

Commercial pipeline:

  • Initial customer: Dow UCC Seadrift, Texas (DOE ARDP demonstration)
  • Other projects: Energy Northwest/Amazon (Washington); Centrica JDA (up to 6 GW, UK)
  • Total pipeline: ~11 GW (≈144 Xe‑100 reactors)
  • Component supply: 16-unit reservation with Doosan Enerbility (South Korea)

Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.

Featured Companies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *